ZG Executed contract to build $20 million project

ZG has executed a contract to build projects Valencia 2 and Valencia 3. These projects are located in Imperial, CA and total 8.6 MW. Construction should begin in September 2019. ZG will provide Owner Engineering services and the expected COD is 2020.

Additional Posts
ZGLOBAL_Icon_White_Web_RGB.png

© 2019 ZGlobal Inc., Power Engineering and Energy Solutions. 
604 Sutter Street Suite 250, Folsom, California 95630 Phone: 916.985.9461 Fax: 916.985.9467 Email: info@zglobal.biz

 

 

INTRANET | WEBMAIL