Imperial Valley Food Bank approved ZG to add a 500kw rooftop solar system to their facility

ZG was approved to engineer, procure, construct and operate a rooftop solar system on the new Imperial Valley Food Bank facility. In addition, ZG will construct a commercial sized solar carport. This 500kw solar project should be online by the third quarter of 2020.

Additional Posts
ZGLOBAL_Icon_White_Web_RGB.png

© 2019 ZGlobal Inc., Power Engineering and Energy Solutions. 
604 Sutter Street Suite 250, Folsom, California 95630 Phone: 916.985.9461 Fax: 916.985.9467 Email: info@zglobal.biz

 

 

INTRANET | WEBMAIL