ZG Executed contract to build $20 million project

September 1, 2019

ZG has executed a contract to build projects Valencia 2 and Valencia 3. These projects are located in Imperial, CA and total 8.6 MW. Construction should begin in September 2019. ZG will provide Owner Engineering services and the expected COD is 2020.

Share on Facebook
Share on Twitter
Please reload

Additional Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
ZGLOBAL_Icon_White_Web_RGB.png

© 2019 ZGlobal Inc., Power Engineering and Energy Solutions. 
604 Sutter Street Suite 250, Folsom, California 95630 Phone: 916.985.9461 Fax: 916.985.9467 Email: info@zglobal.biz

 

 

INTRANET | WEBMAIL