Imperial Valley Food Bank approved ZG to add a 500kw rooftop solar system to their facility

February 28, 2019

ZG was approved to engineer, procure, construct and operate a rooftop solar system on the new Imperial Valley Food Bank facility. In addition, ZG will construct a commercial sized solar carport. This 500kw solar project should be online by the third quarter of 2020.

Share on Facebook
Share on Twitter
Please reload

Additional Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
ZGLOBAL_Icon_White_Web_RGB.png

© 2019 ZGlobal Inc., Power Engineering and Energy Solutions. 
604 Sutter Street Suite 250, Folsom, California 95630 Phone: 916.985.9461 Fax: 916.985.9467 Email: info@zglobal.biz

 

 

INTRANET | WEBMAIL