ZG to support the CPUC in the evaluation of need for the proposed Wheeler Junction Project

October 1, 2019

ZG is part of the team supporting the California Public Utility Commission (CPUC) evaluation of the need for the proposed Wheeler Ridge Junction Project near Bakersfield, CA.

 

The project includes:

  1. Construction of a new 230/115kV substation – Casa Loma Substation

  2. Upgrade of the Kern Stockdale 230kV line and reconfigure of the existing tapped        connection to Stockdale to a loop-in.

  3. Reconductor of the Stockdale – Casa Loma 230kV line and converting current double circuit line to 115kV.

  4. Reconductor segments of the Casa Loma 115kV line.

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Additional Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
ZGLOBAL_Icon_White_Web_RGB.png

© 2019 ZGlobal Inc., Power Engineering and Energy Solutions. 
604 Sutter Street Suite 250, Folsom, California 95630 Phone: 916.985.9461 Fax: 916.985.9467 Email: info@zglobal.biz

 

 

INTRANET | WEBMAIL