ZGlobal Identifies Critical Error Leading to Elimination of Transmission System Upgrades
ZGlobal provided review of the CAISO’s interconnection results in which the interconnection requested additional capacity for Panoche Energy Center. This request identified over $25 million in transmission system upgrades, which were eliminated after reassessment following ZGlobal’s identification of a critical error in the CAISO cluster study’s short circuit results.