In late January 2017, NextEra Energy Transmission West (NEET West) and Pacific Gas and Electric (PG&E) submitted an application to the California Public Utility Commission (CPUC) to construct the Estrella Substation and Paso Robles Area Reinforcement Project. This project would consist of building additional components to the existing Estrella Substation site to connect the new substation to the new transmission line and local power grid, modify the existing Morro Bay-Gates 230 kV transmission line to connect to NEET West’s Estrella Substation, and construct a new 70 kV transmission line to connect the San Miguel-Paso Robles to meet the Estrella Substation.

 

ZGlobal was retained by the CPUC to independently evaluate the feasibility of and need for this project, as well and identify any viable alternatives.

Share on Facebook
Share on Twitter
Please reload

Additional Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
ZGLOBAL_Icon_White_Web_RGB.png

© 2019 ZGlobal Inc., Power Engineering and Energy Solutions. 
604 Sutter Street Suite 250, Folsom, California 95630 Phone: 916.985.9461 Fax: 916.985.9467 Email: info@zglobal.biz

 

 

INTRANET | WEBMAIL