Three Solar Projects Achieve Commercial Operations

April 26, 2018

The ZGlobal Infrastructure Development team was retained by a private equity firm to provide full service “Turn Key” projects for three plants located in Imperial, CA; Madera, CA and Merced, CA. The three projects are a combined total of 11 MW’s. The facilities were designed, permitted, engineered and commissioned by ZGlobal and were built on schedule and on budget.  This brings a total of 340 MW of solar and energy storage projects developed by the ZGlobal Infrastructure Development team.

Share on Facebook
Share on Twitter
Please reload

Additional Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
ZGLOBAL_Icon_White_Web_RGB.png

© 2019 ZGlobal Inc., Power Engineering and Energy Solutions. 
604 Sutter Street Suite 250, Folsom, California 95630 Phone: 916.985.9461 Fax: 916.985.9467 Email: info@zglobal.biz

 

 

INTRANET | WEBMAIL